Pages

Tuesday, March 24, 2015

On again with the bathroom reno

On we continue with the bathroom upgrade....we have had a few delays as you know, waiting for that bath and shower.....Once the shower base/sides were installed the man added extra glue down inside the white panel and used these neat pressure poles to push against and make sure it glued flat and no bubbles...

He has been busy filling the joins in the sheets of aqua check 

and sanding back once dried....

The bath finally arrived today early morning and luckily the plumber was able to assist installing it to a certain point.....he then left the man to continue on with other bits that needed to be done under the bath and some of the surrounds as he had another job he was needed for.... it was more than a tight squeeze so some timber had to be trimmed...

The plumber came back in the afternoon to remedy another small problem and even attached the tap temporarily to get some water in the bath to check how it all leveled out and of course possible leaks....none thank goodness ☺

So for now this is where the bath is at.....walls still needing to be completed etc...

We still do not have the window so it is staying like this for now and we expect the plasterer tomorrow.....and he should be working on this over the next 2 days....wish us luck ☺
Then possibly the plumber may be back over the weekend.....
And here is the state of one of the spare bedrooms for guests to sleep in......no sleeping here lol

and the other spare room where grand kiddies can stay.....not at the moment :( 

There is the fittings for the shower waiting to be installed....

and the shower screens and door.....will be great once completed maybe by end of next week except floor and painting....
It is certainly giving me something to blog about lol
Thanks for visiting again too xoxo


1 comment:

  1. I continue to wish this was happening to my master bath. ((hugs)), Teresa :-)

    ReplyDelete